Phase 2 of Studio City Macau, designed by internationally-renowned architectural firm Zaha Hadid Architects, will open in phases. This latest expansion project of the integrated resort will see the opening of the “Studio City Indoor Water Park” on April 6.
Studio City Water Park covers approximately 26,000 square meters, connecting both indoor and outdoor areas.
The indoor water park features seven purpose-built state-of-the-art water slides, including Macau’s first water coaster, “Lightspeed Shuttle”, which is equipped with specially-designed nozzles to propel the raft and its occupants upward against the pull of gravity leading to the raft sliding through a sequence of drops, uphill turns and dark sections.
In addition to the existing outdoor water park, the indoor park also features the first-ever indoor surfing simulator in Macau, which requires a certain level of skill to control one’s position and balance on the wave.